Utica's 2025 Spring Maintenance Outage

Project Name: Utica's 2025 Spring Maintenance Outage
Status: Complete
Description:
Spring Outage Conveyance & Operations Work Summary
Conveyance System Improvements:
- Repaired 52 feet of severely degraded ¾ Mile Flume and replaced three failed box sills, with assistance from Cal Fire crews.
- Repaired a 16-foot inlet box at Utica Flume 15 due to significant rot and leakage.
- Vegetation was cleared along the Utica Canal near ¾ Mile and Flume 10 by Cal Fire crews.
- Drained and cleaned Angels Forebay for annual maintenance to prevent vegetation growth and ensure summer reliability.
Operations & Mechanical Upgrades:
- Significant hydraulic system upgrades, to Angels Powerhouse, were completed, including:
- Replacement of leaking needle shaft seal and worn valve key.
- Installation of a new hydraulic pressure unit, accumulator, manifold, and control switches.
- Electrical upgrades including AC line and DC control wire replacements.
- Fabrication and installation of new ram components for enhanced performance.
Timeline: April 1, 2025 - April 18, 2025