Utica's 2025 Spring Maintenance Outage

Wooden walkway under construction on a rocky hillside, with tools and a ladder visible.

Project Name: Utica's 2025 Spring Maintenance Outage

Status: Complete

Description:

Spring Outage Conveyance & Operations Work Summary

Conveyance System Improvements:

  • Repaired 52 feet of severely degraded ¾ Mile Flume and replaced three failed box sills, with assistance from Cal Fire crews.
  • Repaired a 16-foot inlet box at Utica Flume 15 due to significant rot and leakage.
  • Vegetation was cleared along the Utica Canal near ¾ Mile and Flume 10 by Cal Fire crews.
  • Drained and cleaned Angels Forebay for annual maintenance to prevent vegetation growth and ensure summer reliability.

Operations & Mechanical Upgrades:

  • Significant hydraulic system upgrades, to Angels Powerhouse,  were completed, including:
    • Replacement of leaking needle shaft seal and worn valve key.
    • Installation of a new hydraulic pressure unit, accumulator, manifold, and control switches.
    • Electrical upgrades including AC line and DC control wire replacements.
    • Fabrication and installation of new ram components for enhanced performance.

 

 



Timeline: April 1, 2025 - April 18, 2025