Skip to main content

2021 | Utica Water and Power Authority in 2021

A narrow mountain trail alongside a railway line built on a steep rocky slope, surrounded by rugged terrain and vegetation.

With more than 25 years of deferred maintenance and infrastructure dating back to the 1800s, the cost of replacing and repairing the conveyance system and hydro plants is extremely high. (Pictured: Photo of current flume system)

Join our mailing list